Key Achievements

Celebrating our remarkable milestones and projects

1. Amarnath Yatra Arrangements (2022, 2023, 2024)

M/s Rasraj Electricals played a vital role in ensuring smooth electrical infrastructure for the Amarnath Yatra in 2022, 2023, and 2024.

  • High Tension Power Supply: Provided uninterrupted power to base camps and along the route.
  • Temporary Electrical Installations: Fast-tracked installations to support the pilgrimage.
  • Enhanced Safety & Security: Deployed mobile substations and power backup systems.
  • On-ground Logistics: Coordinated deployment of equipment and materials across difficult terrain.

2. Erection of 10 Kms of AB Cable in Patnitop Hills (2023)

This project provided a robust electrical supply to the Indian Air Force at Nathatop.

  • Innovative Installation Techniques: Utilized techniques to lay cables securely in a mountainous environment.
  • Logistical Management: Overcame weather and terrain challenges to ensure timely installation.
  • Seamless Integration: Integrated the system with existing infrastructure.

3. Supply, Erection, Testing, and Commissioning of 4 MVA 33/11 KV Substation (2023)

We designed, supplied, and commissioned a 4 MVA substation in Marog Ramban.

  • 4 MVA 33/11 KV Substation: High-efficiency transformers and switchgear were installed for optimal distribution.
  • 7 Kms of 33 KV Transmission Line: Delivered power via a robust transmission line.
  • Dual 11/0.433 1250 KVA Substations: Two substations were built to handle high-demand areas.